Cropr
Coordinate growers, harvest lots and collection windows across the field and packing desk.
Open Cropr Explore Cropr in detail Explore the workflow Get a quote →Follow a harvest lot from the field to collection.
Collection schedule
| Harvest lot | Pickup |
|---|---|
| North orchard | Confirmed |
| Hillside orchard | Time changed |
| River plot | Confirmed |
The collection note moves pickup to the afternoon. Confirm the grower has received the new time before dispatching the vehicle.
Collection note · Hillside orchard
Use the afternoon collection window. Grower acknowledgement outstanding.
When several farms share a collection point, a changed pickup time can affect an entire morning. Cropr connects the field note, the lot and the collection record so the coordinator can see what still needs a call.
The coordinator records the acknowledgement against the lot so the field and collection teams work from the same schedule.
Rescheduling a harvest pickup
A collection sheet linking each revised pickup to its grower.
-
Identify the lot
Read the orchard, grower contact and collection window for the lot due at the packing desk.
-
Check the change
Compare the revised pickup time with the collection note and the dispatch schedule.
-
Confirm with the grower
Record the acknowledgement against the lot so the driver and packing team see the same arrangement.
